Power points, lighting and equipment locations are easier to plan before the walls and ceilings are finished. Bring the electrical scope into the renovation conversation early.
Plan around the way you use the rooms
Start with furniture, work surfaces and everyday routines. A floor plan becomes more useful when it shows where you cook, work, charge devices and move through the home.
Share appliance specifications as soon as possible. Kitchens, air conditioning and hot water changes may affect circuits and supply requirements.
Make a room-by-room brief
A written brief helps you compare the scope and reduces last-minute changes. You do not need to specify the wiring design; explain what the room needs to do.
- Lighting purpose and switching positions
- Power points and fixed appliance locations
- Data, internet and television needs
- Ventilation, heating and cooling
- Outdoor areas and future equipment
Assess what is already there
Existing wiring and switchboard capacity should be checked before assuming they can serve the renovated space. The condition and proposed changes determine the work needed.
Discuss smoke alarms and circuit protection alongside the renovation. Requirements may apply when a dwelling is substantially renovated.
Coordinate the sequence
Agree when the electrician needs access for initial wiring, fit-off and testing. Confirm who supplies fittings and which details must be finalised before each stage.
Keep the quote and any approved variations together. At handover, ask about circuit labels, controls and documentation for the completed work.